IS415UCVGH1A GE Mark VI Controller Card
مشخصات فنی
Manufacturer: GE General Electric
Condition:New with Original Package
Product Type: Controller Cards
-
Country of Origin: USA
Payment:T/T, Western Union
Shipping port: Xiamen
Warranty: 12 months
با ارسال درخواست برای این مورد، تأیید میکنید که شرایط و ضوابط ما را بررسی و پذیرفتهاید. لطفاً توجه داشته باشید که تمام تراکنشها به صورت آفلاین پردازش خواهند شد.
از یک متخصص بپرسید
به ما کمک کنید به افراد بیشتری دسترسی پیدا کنیم! این محصول را با شبکه خود به اشتراک بگذارید و حمایت خود را نشان دهید!
Product Description
The GE IS415UCVGH1A, also cataloged as the IS415UCVGH1A controller card, executes control processing and Ethernet data communication within the GE Mark VI turbine control system. It uses an Intel Ultra Low Voltage Celeron processor operating at 650 MHz, with 128 MB SDRAM and a QNX operating system. Two 10Base-T/100Base-TX Ethernet ports support controller communication, configuration access, and Ethernet Global Data (EGD) networking.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | IS415UCVGH1A |
| Brand | General Electric (GE) |
| Series | Mark VI |
| Product Type | VME Controller Card |
| Board Configuration | Single-Slot Board |
| Processor | Intel Ultra Low Voltage Celeron, 650 MHz |
| SDRAM | 128 MB |
| Flash Memory | 128 MB (as stated in the supplied description) |
| Operating System | QNX |
| Ethernet Interfaces | 2 x 10Base-T/100Base-TX, RJ-45 |
| Power Requirements | +5 VDC |
| Operating Temp | 0 to 70 deg C |
| Origin | United States |
| Manual | GEH-6421M |
Ethernet Communication and Controller Architecture
The IS415UCVGH1A uses two Ethernet interfaces for separate communication functions within the Mark VI control architecture.
- Primary Ethernet: Supports communication with other control system components and configuration access through the Unit Data Highway (UDH).
- Secondary Ethernet: Supports private Ethernet Global Data (EGD) networks or Modbus communication on a separate logical IP subnet.
- Configuration Management: The Toolbox software configures the secondary Ethernet interface. During rack startup, the controller checks the Toolbox configuration against the installed hardware.
- Processor Resources: The 650 MHz Celeron processor, 128 MB SDRAM, and QNX operating system provide the computing environment for controller execution and communications.
The available specifications do not establish the exact firmware revision, supported Modbus variants, or maximum EGD data throughput. Verify these details against the applicable Mark VI documentation before system integration.
Frequently Asked Questions
Q: What power supply does the IS415UCVGH1A require?
A: The supplied specification identifies +5 VDC as the power requirement. Confirm the applicable rack power distribution and board current demand in the GEH-6421M manual before installation.
Q: Can both Ethernet ports connect to the same network?
A: The documented configuration supports separate communication roles, including UDH communication and a private EGD network or Modbus on a different logical IP subnet. Confirm network addressing and topology requirements before connecting both ports.
Q: Is the IS415UCVGH1A hot-swappable?
A: The supplied information does not confirm hot-swap capability. Follow the Mark VI rack maintenance procedure and verify the permitted insertion and removal conditions before replacing the board.
Field Installation Guidelines
- Verify the hardware: Check the complete IS415UCVGH1A part number, board revision, and rack compatibility against the applicable Mark VI documentation.
- Confirm power conditions: Verify the rack power distribution and +5 VDC supply requirements before inserting the controller card.
- Inspect the slot: Check the board guides, connector alignment, and backplane interface for physical damage or contamination.
- Configure Ethernet: Assign the required IP settings and confirm the UDH, EGD, or Modbus network topology. Use the approved Toolbox configuration.
- Separate network paths: Where the application requires separate logical subnets, verify the addressing, routing, and network isolation settings for each Ethernet interface.
- Validate startup: After installation, check controller status, configuration consistency, and communication with connected control system components.
- Check documentation: Use GE manual GEH-6421M to verify installation, configuration, and maintenance requirements for the applicable hardware revision.
Other Attributes
- Series: GE Multilin 350 Feeder
- Country of Origin: USA
- Lead Time: In Stock, 2 Working Days
In Stock Hot Items of The GE General Electric Mark VI
| IS200ICBDH1ABB | IS210MACCH2AGG | IS220YAICS1AJ |
| IS220PPRAH1A | IS210AEBIH1BEA | IS220YDIAS1AK |
| IS220UCSAH1A | IS200ISBEH1ABB | IS220YDOAS1AJ |
| IS200ACLEH1BCB | IS200TBAIH1CDC | IS420ESWBH3A |
| IS200EPSMG2AED | IS210AEDBH4AGD | IS420UCSCS2A |
| IS200EROCH1ABC | IS200AEADH4ADA | IS410JPDHG1A |
| IS200ERIOH1ABC | IS200REBFH1BBA | IS200TBAIS1CED |
| IS200ERDDH1ABB | IS210AEBIH3BED | IS200TBCIS2CCD |
| IS200DSPXH1DBD | IS220PCLAH1A | IS200TRLYS1BGG |
| IS230TRLSH2B | IS420UCSCH1C | IS230TAISH2C |
| IS220PDIAH1B | IS200DSPXH1DBD/DSPXH1D | IS230TCISH6C |
Our Competitive Brands
- - ABB Advant-800xA,Advant OCS,Bailey Infi 90 and Net 90,H&B Freelance 2000,DSQC Robots,IGCT / IGBT
- - GE General Electric Field Control, Genius I/O, QuickPanel, RX3i PacSystem, Series 90, Series 90, Series VersaMax
- - Allen Bradley Allen-Bradley SLC500, MicroLogix, CompactLogix, ControlLogix, PLC-5, Panel View,
- - Bently Nevada 3300 System, 3500 System
- - Honeywell 7800 Series, FSC, IPC, Mxopen, TDC 2000, TDC 3000, Experion PKS(C200,C300)
- - Yokogawa Centum CS - Centum VP, Centum XL - micro XL, FA-M3, ProSafe-PLC
- - Ovation, Foxboro, EPRO, Emerson DeltaV, Fuji, Siemens, HIMA, Prosoft, Invensys Triconex, ICS TRIPLEX, Woodward, Bachmann, Schneider
Question 1: Is Our Price Competitive?
NEW-GEN collaborates with over 50 countries worldwide. As a leading supplier in China, we can provide significant discounts to customers based on market demand.
Question 2: What Is The Warranty Period?
We offer a standard one-year warranty for all new and original items.
Question 3: What Payment Methods Do We Accept?
We accept 100% T/T (Telegraphic Transfer) before shipping. For items with a lead time, a 30% deposit is required in advance, with the remaining 70% balance due before shipping. If you have an agent in China, please contact us for RMB transfer.
Question 4: What Shipping Methods Do We Use?
We primarily utilize carriers such as FedEx, DHL, UPS, BRE, etc. If you have an account with any of these carriers, you can arrange the shipping yourself. Additionally, we offer free shipping to China freight forwarders.
Question 5: What Is Our Delivery Time?
Typically, delivery takes around 1-3 days after receiving the advance payment. For items with a quoted lead time, delivery will occur as per the specified lead time.
Question 6: How Do We Package The Goods?
Our packaging process involves multiple layers of protection. Initially, the product is placed in its original box, sealed with a label. Then, we add a layer of bubble wrap to safeguard against collisions during transportation. Finally, all products are securely packed in sturdy boxes for further protection.
Question 7: How Can Customers Contact Us And Request A Quote?
Customers can inquire via email, WhatsApp, WeChat, Skype, or any preferred communication platform. Simply reach out to us, and we'll promptly provide a quote tailored to your needs.